בקשר להנעה בנתב"ג-
ציטוט מתוך AIP ISRAEL, AD 2.5, LLBG AD 2.20
apron B start-up procedure: aircraft shall start-up all
engines on stand. When all engines are running,
‘push-back’ will be carried out to the nearest release
point (S1, S2) and taxiing will commence as soon as
possible.
- aprons B, C, D of terminal 3 (Ground West): Engine
start-up while aircraft is connected to the gate is
prohibited. Start-up while aircraft is being pushed
back is permitted.